PM Optimization in Steel Industry Through Re-Engineering Critical Parts
BoK Content Type:
Presentation Slides
Presentation Paper
BoK Content Source:
MainTrain 2015
Original date:
Tuesday, September 29, 2015
The evolution of Preventive Maintenance (PM) is based on analyzing equipment operating conditions, its criticality to production and maintenance cost. In this case study, participants will see the journey starts with setting safe PM schedule and parts stock to sustain production. Then root causes of failures are analysed, and plans for improvement are launched. Learn how plans-in-action should be supported by motivating everyone to the expected achievement. Ahmed will share that implementation is not the end of journey - it is where we need to evaluate whether we landed on the right solution from all aspects. He will also show that sometimes, touch ups are needed. Participants will see the real journey of RajhiSteel, started with a greenfield mini mill 8 years ago. See real examples of doing more than PM in the harsh environment of steel melting Electric Arc Furnace (EAF) and its specific equipment as Water Cooled Cables (WCC).