Abstract (Presentation Description) / Résumé (description de la présentation)
Operational Reliability for rotating machinery is directly link to the way the machine is installed. My experience from North Sea Oil and Gas industry is that precision procedures must be put into the place before the equipment is fabricated and installed taking into the consideration HSE. Installation procedures such as " Foundation Flatness and Levelness, Soft Foot, Precision shaft Alignment, Pipe strain, Nozzle Load and Thermal Expansion must be measured and verified during the installation to assure proper functionality of the equipment. In the commissioning phase the equipment must be tested and verified. I will be speaking about the these installation procedures and how to achieve Reliable operation of rotating equipment.
If this content has been presented before, please provide some information and context
CMC Latam Mexico 2022